|
Energy & Power Department , South District
|
| |
Head of Department
|
Mr. C. P. Rai |
Superintending Engineer |
253411 |
Details Of Staff
|
|
Executive Engineer
(Jorethang Division)
|
|
|
Executive Engineer
(Namchi Division)
|
|
|
Executive Engineer (Melli Division)
|
|
|
Executive Engineer
(EHV Division) |
|
|
Assistant Engineer
(Jorethang Sub-Division) |
|
Mr. Khusendra Rai |
Assistant Engineer
(Jorethang Sub-Division)
|
|
|
Assistant Engineer
(Jorethang Sub-Division)
|
|
Mr. Rajendra Pradhan |
Assistant Engineer
(Namchi Sub-Division)
|
|
|
Assistant Engineer
(Ravang Sub-Division)
|
|
|
Assistant Engineer
(Namthang Sub-Division)
|
|
Mr. Pradeep Chettri |
Assistant Engineer
(Melli Sub-Division)
|
|
|
Assistant Engineer
(EHV Sub-Division)
|
|
|
|
| |
| |
Schemes
undertaken by South Circle during 2008-09 &
2009-10 :
| 1. |
Drawing of 11 KV transmission lines under
APDRP |
2 nos. |
| 2. |
Drawing of 132 KV S/C line from Sagbari to
Ravongla under N.L.C.P.R. |
1 no. |
| 3. |
Drawing of 11 KV 3 Ph Tr. Line,Upgradation
of existing S/S, Re-strengthening, etc.
under SCSP |
3 nos. |
| 4. |
Various works of rural electrification
throughout South District under M. D. S. |
89 nos. |
| 5. |
Augmentation, drawing of lines,
electrification, extention, etc. under TSP : |
8 nos. |
| 6. |
Conversion of overhead L.T. line into
underground cable at Ravongla under NEC : |
1 no. |
| 7. |
Erection, testing of materials & equipments,
design, engineering, etc. Under RGGVY : |
4 nos. |
|
|
|
|
| |
|
|
|
|
| |
| |
|
|