The Backward Regions Grant Fund is designed to
redress regional imbalances in development. The fund
will provide financial resources for supplementing and
converging existing developmental inflows into 250
identified districts, so as to:
1.
Bridge critical gaps in
local infrastructure and other development requirements
that are not being adequately met through existing
inflows.
2.
Strengthen, to this end
Panchayat and Municipality level governance with more
appropriate capacity building, to facilitate
participatory planning, decision making, implementation
and monitoring, to reflect local felt needs,
3.
Provide professional
support to local bodies for planning, implementation and
monitoring their plans
Improve the performance and delivery of critical
functions assigned to Panchayats, and counter possible
efficiency and equity losses on account of inadequate
local capacity.
Integrated development will commence with each
district undertaking a diagnostic study of its
backwardness by enlisting professional planning
support. This will be followed by preparing a
well-conceived participatory district development
perspective plan to address this backwardness during
2006-07 and the period of the Eleventh Five-Year. The
Panchayats at the village, intermediate and district
level, referred to in Part IX of the Constitution, will
undertake planning and implementation of the programme,
in keeping with the letter and spirit of Article 243 G,
while the Municipalities referred to in Part IX A will
similarly plan and implement the programme in urban
areas in conformity with the letter and spirit of
Article 243 W, read with Article 243 ZD of the
Constitution.
The Programme has two components namely,
a district component covering 250 districts and Special
plans for Bihar and the KBK districts of Orissa. A
total provision of Rs. 5000 crore had been made for the
two components in the Budget of 2006-07. Out of this
allocation Rs. 1250 crore had been provided in the
Demand for Grants of the Ministry of Finance for the
Special Plans dealt with by the Planning Commission. The
remaining amount of Rs. 3750 crore had been placed at
the disposal of the Ministry of Panchayati Raj for the
District Component, covering 250 districts. The
allocation of Rs. 3750 crore consisted of two funding
windows (a) capacity building fund of Rs. 250 crore and
(b) development grants of Rs. 3500 crore for the
financial year 2006-07. This allocation was reduced to
Rs.1925 crore at the Revised Estimates stage. The
allocation during 2007-08 was Rs.4670 Crore comprising
Rs.250 Crore for capasity building and Rs.4420 Crore for
development grant. This budgetary allocation was reduced
to Rs.3600 Crore at the stage of Revised Estimates.
The existing Rashtriya Sam Vikas Yojana (RSVY)
has been subsumed into the BRGF Programme. The
erstwhile districts under RSVY will receive their full
allocation of Rs. 45 crore per district as per norms of
RSVY. Thereafter, they will shift to the BRGF mode of
funding.
An amount of Rs. 1925 crore was released
under the BRGF programme during the Financial Year
2006-07.
In
2007-08 Rs. 3597.50 crore has been released as on
31.3.2008 BACKWARD REGIONS
GRANT FUND
BRGF WORKS TO BE TAKEN
BY SOUTH DISTRICT ZILLA PANCHAYAT
|
Sl.
No. |
Name of Work |
GP/Territorial Constituency |
Ward |
Amount |
|
(A) Rural Development Fund |
|
1. |
Distribution of
hybrid cows for 08 persons on cluster basis. |
Chisopani |
Chisopani |
3,42,064.00 |
|
2. |
RWSS water
repair at Samater. |
Chisopani |
Samatar |
1,02,278.00 |
|
3. |
Distribution of
hybrid cows for 08 persons on cluster basis. |
Sadam Suntaley |
Lr. Sadam |
3,42,064.00 |
|
4. |
Electrification
& wiring for PHSC at Sadam. |
Sadam Suntatey |
Upper
Sukrabarey |
1,02,278.00 |
|
5. |
Distribution of
Hybrid Cows for 08 persons on cluster basis. |
Temi Tarku |
Aifaltar & Temi |
3,42,064.00 |
|
6. |
Construction of
RCC water distribution tanks at Aifaltar
|
Temi Tarku
|
Aifaltar |
1,02,278.00 |
|
7. |
Distribution of
Hybrid Cows for 08 persons on cluster basis. |
Wok Omchu |
Upper /Lower
Chumlok |
3,42,064.00 |
|
8. |
Provision for
cow shed at Wok. |
Wok Omchu |
-do- |
1,02,278.00 |
|
9. |
Distribution of
Hybrid Cows for 08 persons on cluster basis. |
Lingi Paiyong |
Lingi |
3,42,064.00 |
|
10. |
Provision for
RWSS under Lingi Paiyong Zilla Territory. |
-do- |
-do- |
1,02,278.00 |
|
11. |
Distribution of
hybrid cows for 08 persons on cluster
|
Ravong Namprik |
Ningang Rankey |
3,42,064.00 |
|
12. |
IAY
augmentation at Rolok ward to 01 beneficiary. |
-do- |
Rolok
|
38,500.00 |
|
13. |
IAY at Gangla
ward to 01 beneficiary @ Rs. 38,500/- |
-do- |
Gangla |
38,500.00 |
|
14. |
Provision for
PVC Tanks at Ben Namphrik |
-do- |
Kabey & Dojok |
25,278.00 |
|
15. |
Distribution of
hybrid cows for 08 persons on cluster basis. |
Yangang
Sripatam |
Pathing & Satam |
3,42,064.00 |
|
16. |
Provision for
fencing work of secondary school, Namphok. |
-d0- |
Namphok
|
1,02,278.00 |
|
17. |
Construction of
village road from Gurung Goan to Karki Goan. |
Lingmoo
Mangzing |
Lower Mangzing |
4,44,342.00 |
|
18. |
Provision for
dry wall at Lower Chuba College Khola. |
Rameng
Nizrameng |
Lower Chuba |
4,44,342.00 |
|
19. |
Repair of RWSS
at Tingrithang. |
Mamley Damthang |
Lr./Tingrithang
& Lr Kholaghari |
1,50,000.00 |
|
20. |
Repair of MIC
at Lower Kamrang Mainabotey. |
-do- |
Lr. Kamrang |
1,50,000.00 |
|
21. |
Repair of RWSS
at Lachinthang to Singatar. |
-do- |
Chemchey |
1,44,342.00 |
|
22. |
Repair of
Assanthang JHS school building. |
Salghari |
Upper & Lr.
Assangthang |
1,00,000.00 |
|
23. |
IAY
augmentation to 04 beneficiaries |
-do- |
Assangthang,
Dumigoan & U/Dorop |
1,54,000.00 |
|
24. |
Repair of
village road from PMGSY road to Salghari PHSC. |
-do- |
Salghari ward |
1,90,342.00 |
|
25. |
Water tank
repairing & cleaning at Nalik. |
Sanganath |
Nalik |
2,50,000.00 |
|
26. |
Repair of water
tank at Chekhim. |
-do- |
Chekhim |
1,94,354.00 |
|
27. |
Distribution of
hybrid cows for 08 persons on cluster basis. |
Bermiok
Namphing |
Bermiok |
3,42,064.00 |
|
28. |
Construction of
jeepable road from Agriculture road to lecpha
Goan. |
-do- |
Lr/Tokal |
1,02,278.00 |
|
29. |
Provision for
source development at Lungchok. |
Submuk kartikey |
Lungchok |
50,000.00 |
|
30. |
Provision for
source development at Kamarey. |
-do- |
Kamarey |
50,000.00 |
|
31. |
Provision for
source development at Belbotey. |
-do- |
Belbotey |
50,000.00 |
|
32. |
Construction of
view point at Sumbuk |
-do- |
Sumbuk |
2,94,342.00 |
|
|
|
|
TOTAL (A) |
62,20,800.00 |
|
|
|
|
|
|
|
BRGF WORKS TO BE TAKEN
BY SOUTH DISTRICT ZILLA PANCHAYAT
|
Sl.
No. |
Name of Work |
GP/Territorial Constituency |
Ward |
Amount |
|
(B) SC/ST PLAN DEVELOPMENT FUND |
|
1. |
Augmentation of
RWSS at Lr. Boomtar. |
Maniram
Singithang |
Lr. Boomtar |
1,00,000.00 |
|
2. |
Construction of
village road from New Sec. School to Saka united
Club House at Apatan Marg. |
-do- |
U/Boomtar |
1,10,000.00 |
|
3. |
Construction of
protective wall at Ahlay near Dilip Sharma’s
House beside Youth Hostel. |
-do- |
Gangyap Ahley |
70,000.00 |
|
4. |
Distribution of
hybrid cows for 08 persons on cluster basis. |
-do- |
Maniram
|
3,42,064.00 |
|
5. |
Construction of
waiting shed for collection of Horticulture &
Agriculture products at Phalidara. |
-do- |
U/ Phalidara |
97,936.00 |
|
6. |
Distribution of
hybrid cows for 08 ST/SC on cluster basis. |
Kewzing Berfung |
M/Berfung |
3,42,064.00 |
|
7. |
Provision for
2000 ltrs. RCC water supply tanks for 15 ST
family. |
-do- |
Kewzing &
Berfung |
3,77,936.00 |
|
8. |
Construction of
Irrifation Channel & protective wall at Lr.
Polok. |
Ralong Borong |
Lower Poklok |
5,20,000.00 |
|
9. |
Construction of
waiting shed at Ralong Lungsing. |
-do- |
U/Ralong |
1,00,000.00 |
|
10. |
Construction of
waiting shed at Borong Polok. |
-do- |
U/Polok |
1,00,000.00 |
|
11. |
Provision for
source dev. and drinking water supply repairs. |
Tanzi Rateypani |
Tanzi |
2,50,000.00 |
|
12. |
Construction of
Play ground at Rabi Khola Primary School. |
-do- |
Rabikhola |
1,70,000.00 |
|
13. |
Provision Jhora
training work at S.B. Jhora Ranasang. |
-do- |
Rateypani
|
1,50,000.00 |
|
14. |
Provision Jhora
Traing work at Dakwala jhora. |
-do- |
Passi |
1,50,000.00 |
|
15. |
Distribution of
hybrid cows for 08 ST/SC on cluster basis at
Nardang ward. |
Lamaten
Tinkitam |
Nardang |
3,42,064.00 |
|
16. |
Construction of
village road from Tayong 6th mile PWD
road to Pipaley Crematorium (aaprox. 3kms) |
-do- |
Pipaley |
3,77,936.00 |
|
17. |
Completion of
Sara Sikshya Abhiyan School building of Turuk
Sec. School. |
Mellidara
Paiyong |
Mangalbarey |
3,20,000.00 |
|
18. |
Repair of MPCS
building of Turuk. |
-do- |
-do- |
80,000.00 |
|
19. |
Distribution of
spray machine to the progressive farmers of
ST/SC of each ward under Mellidara Paiyong. |
-do- |
All wards under
Mellidara Paiyong ZTC |
3,20,000.00 |
|
20. |
Construction of
Irrigation Channels from Lr. Legship to Nardang. |
Leship |
Nardang |
4,89,000.00 |
|
21. |
IAY
augmentations of 06 SC/ST. |
-do- |
All wards |
2,31,000.00 |
|
22. |
Distribution of
hybrid cows for 08 ST/SC on cluster basis . |
Mikhola Sorok |
Upper/Lower
Mikhola |
3,42,064.00 |
|
23. |
Provision for
water supply to Mazitar School. |
-do- |
Mazitar
Compound |
68,968.00 |
|
24. |
Provision for
water supply to Sorok Manpur School. |
-do- |
Sorok & Manpur |
60,000.00 |
|
25. |
Provision for
water supply to Lower Gom School. |
-do- |
Lower Gom |
60,000.00 |
|
26. |
Construction of
Tourist View point at Mikhola. |
-do- |
Upper Mikhola |
1,88,968.00 |
|
27. |
Construction of
Community Hall at Lr. Nagi. |
Maneyara Turung |
Lower Nagi |
4,00,000.00 |
|
28. |
Provision for
fencing at Kabrey Sec. School playground. |
-do- |
Kabrey |
3,20,000.00 |
|
|
|
|
(B)
TOTAL |
64,80,000.00 |
|
|
|
|
|
|
|
A +
B = 1,27,00,800/-
BRGF ANNUAL PLAN 2010 –
2011 UNDER SOUTH DISTRICT ZILLA PANCHAYAT
|
Sl.
No. |
Name of Work |
Gram Panchayat Unit |
Ward |
Amount
(in Rs.) |
|
|
|
1. |
Construction of
Public Toilet. |
Rongbull
Maniram Singithang |
Khanigoan |
50,000/- |
|
2. |
Protective wall
at Ground, Lungkhia |
Rongbull
Maniram Singithang |
Rong |
50,000/- |
|
3. |
Construction of
Samaj Bhawan. |
Rongbull
Maniram Singithang |
Lr.Salleybong |
50,000/- |
|
4. |
Construction of
Samaj Bhawan. |
Rongbull
Maniram Singithang |
Lr.Phalidara |
50,000/- |
|
5. |
Construction of
Garbage Bin at Maniram Tourism Complex. |
Rongbull
Maniram Singithang |
Maniram |
70,000/- |
|
6. |
Construction of
waiting shed at Damai Dara Bhanzang. |
Rongbull
Maniram Singithang |
Maniram |
50,000/- |
|
7. |
Protective work
at near J.E. Tamang House. |
Rongbull
Maniram Singithang |
L/Boomtar |
50,000/- |
|
8. |
Protective work
at Meena Tamang House, Lr. Boomtar. |
Rongbull
Maniram Singithang |
Maniram |
50,000/- |
|
9. |
Construction of
Garbage bin at Bhanzang Bazar. |
Rongbull
Maniram Singithang |
Alley |
50,000/- |
|
10. |
Construction of
Samaj Bhawan, Alley BVS. |
Rongbull
Maniram Singithang |
Alley |
50,000/- |
|
11. |
Construction of
Tourist rest Centre, Alley. |
Rongbull
Maniram Singithang |
Alley
|
1,50,000/- |
|
12. |
Construction of
Crematorium shed at Bhanzyang Dispensary. |
Rongbull
Maniram Singithang |
Alley |
50,000/- |
|
13. |
Recreation Hall
for Tourist. |
Wak Omchu |
Lr. Wak |
4,44,342/- |
|
|
|
|
|
|
|
14. |
Construction of
stage Pavilion at Secondary School Kamrang.
|
Mamley Kamrang |
Lr. Kamrang |
4,44,342/- |
|
15. |
Protective wall
at Sanganath Subuk PS new play ground. |
Sanganath |
|
4,44,000/- |
|
16. |
Minor RWSS
repair & source development. |
Namphing |
Pabong |
1,00,000/- |
|
17. |
Water
harvesting tank at Bermiok Palak. |
Bermiok |
Bermiok |
40,000/-
|
|
18 |
Water
harvesting tank at Bermiok Passi. |
Bermoik |
Bermiok |
40,000/- |
|
19. |
Water
harvesting tank at Upper Namphing Lepcha Gown.
|
Tanak Namphing |
Namphing |
50,000/- |
|
20. |
Const. of
toilet at Reshep Club House. |
Namphing |
Reshep |
30,000/- |
|
21. |
Minor repair at
Daring Primary Shool. |
Namphing |
Daring |
30,000/- |
|
22. |
Minor repair at
Thangsing Gumpa toilet |
Namphing
Bermiok |
Thangsing |
30,000/- |
|
23. |
Distribution of
Milching cows by Animal Husbandry Deptt. |
|
|
1,34,000/- |
|
24. |
Electrification
connection. |
Sadam Suntaley |
Upper
Sukrabarey |
1,50,000/- |
|
25. |
Repair of
Public Ground |
-do- |
-do- |
1,44,342/- |
|
26. |
Water Tank
(New) |
-do- |
Upper Sadam |
1,00,000/- |
|
27. |
Water Tank
(New) |
-do- |
Lower Sadam |
50,000/- |
|
28. |
Protective wall |
Poklok Denchung |
|
1,50,000/- |
|
29. |
New Harvesting
water tank |
-do- |
|
1,50,000/- |
|
30. |
Protective wall |
-do- |
|
1,44,342/- |
|
31. |
Repair of road |
Temi |
Upper Tanak |
2,00,000/- |
|
32. |
Repair of road |
Temi |
Aifaitar |
2,44,342/- |
|
33. |
Const. of
community hall. |
Tanzi Bikmat |
Tanzi |
3,00,000/- |
|
34. |
Fencing at
Rateypani PHSC. |
Rateypani |
M/Rateypani |
2,00,000/- |
|
35. |
Const. of RMC
shed |
Tanzi Bikmat |
Ramaram
|
2,20,000/- |
|
36. |
Const. of stag
at Govt. Sr. Secondary School at Lingmoo Ground.
|
Lingmoo
Kolthang |
Middle Kolthang |
4,44,342/- |
|
37. |
Public ground
stage at Perbing. |
Perbing Dovan |
U/Perbing |
3,00,000/- |
|
38. |
Repair of play
ground at Burul School. |
Rameng
Nizrameng |
Burul |
1,44,342/- |
|
39. |
Construction of
stockman Centre (AH&VS) |
Salghari |
Upper Dorop |
4,44,342/- |
|
40. |
Repairing
Ramabong PS. |
Mellidara
Paiyong |
U/Ramabong |
1,80,000/- |
|
41. |
Construction of
Community Hall at Gupti. |
Mellidara
Paiyong |
Gupti |
2,60,000/- |
|
42. |
Reservoir tank
at Barbotey Dhara, Mellidara.
|
Mellidara
Paiyong |
Mellidara |
1,20,000/- |
|
43. |
Construction of
stage at Paiyong JHS. |
Mellidara
Paiyong |
U/Paiyong |
1,60,000/- |
|
44. |
Construction of
Pavilion at Lingi Sec. School. |
Lingi Sokpay |
U/Lingi |
4,44,342/- |
|
45. |
Provision for
distribution of poly pipe and Syntex at Lr.
Tinkitam. |
Lamaten
Tinkitam |
Lower Tinkitam |
3,00,000/- |
|
46. |
Provision for
distribution of tools for agriculture farming. |
Lamaten
Tinkitam |
Lower Tinkitam |
4,20,000/- |
|
47. |
Const. of view
point at Lungchok. |
Lungchok
kamarey |
Lungchok |
1,10,000/- |
|
48. |
Const. of
community centre at Tharpu. |
-do- |
Tharpu |
1,14,000/- |
|
49. |
Const. of
additional one room (patient) at Sumbuk PHSC |
Sumbuk Kartikey |
Sumbuk |
1,10,000/- |
|
50. |
Const. of view
point at Sombarey. |
-do- |
Sombarey |
1,10,000/- |
|
51. |
RWSS at Manger
Dalam under Ralong Namlung GPU. |
Ralong Borong |
Mangerdalam |
1,00,000/- |
|
52. |
RWSS at Lr.
Polok under Borong Phamtam GPU. |
Borong Phamtam |
Lr. Polok |
6,20,000/- |
|
53. |
Provision for
Const. of jeepable road from Ravong toDojok
Turning point Yangang Road. |
Ravong Namphrik |
|
4,44,342/- |
|
54. |
Provison for
const. of Rural Markering Centre at Lower
Legship. |
Legship |
Lr. Legship |
|
|
|
|
|
|
|
|
`
|